Ready-welded bridge segment before coating
Bridge pylon segment during finishing
Finished bridge pylon segment with shear connectors Ø 22x250 mm
Detailed view: completely assembled steel substructure
Completely assembled steel substructure of the railway bridge over the Drau in Villach (Austria)
Gevelsberg
+49 (0)2332 55106-0
Dachau
+49 (0)8131 5159-0
info[at]bolte.gmbh
Apr 23 - 26, 2024 Wels, Austria
Oct 22 - 25, 2024 Hanover, Germany