Shear connectors in the new Friedensbrücke over the Sill in Innsbruck (Austria)

Primed bridge segment with shear connectors dia. 22x150 mm

Stud welding unit PRO-D 2200 with stud welding gun GD 22

Primed bridge segment with shear connectors dia. 22x150 mm
Stud welding unit PRO-D 2200 with stud welding gun GD 22

Detailed view: shear connectors dia. 22x150 mm on bridge segment

Delivery of a bridge girder ready for installation with shear connectors dia. 22x150 mm

Unloading of a bridge girder ready for installation with shear connectors dia. 22x150 mm

Insertion of a bridge girder ready for installation with shear connectors dia. 22x150 mm

Insertion of a bridge girder ready for installation with shear connectors dia. 22x150 mm

Installed bridge substructure with shear connectors dia. 22x150 mm

Shear connectors dia. 22x150 mm on installed bridge substructure

Friedensbrücke over the Sill in Innsbruck

Built-in bridge girder

Built-in bridge girder