Automatic stud welding head KKA-200F with both-sided swivel device 45° and angle scale on handling arm Powerflex

(18/04/13) The swivel device 45° with angle scale ensures the exact vertical welding of welding studs on large-sized components with diagonal surfaces.

Threaded knock-off studs for mounting corrosion protection boards in a biogas plant

(07/04/2013) For mounting corrosion protection boards in a biogas plant threaded knock-off studs type PT M8 x 8 x 30 mm are used.

DIN EN ISO 9001:2008: Successful surveillance audit

(03/04/2013) Within the surveillance audit conducted March 26-27, 2013 the efficiency of our quality management system according to DIN EN ISO 9001:2008 was again attested.

Corrected EC Certificate of Conformity

(02/04/2013) GSI SLV Duisburg has corrected our EC Certificate of Conformity 0762 – CPD – 11777 GSIDu-2011.0a with effect from March 21, 2013.

Automatic stud welding head KHA-200F with stud welding unit PRO-D 1600 for welding ground studs with cover cap made of steel

(14/03/2013) With the automatic stud welding head KHA-200F that is mounted on a table top stud welding device with movable workpiece holder ground studs with a cover cap made of steel are welded.

Schöler + Bolte shear connectors in the new Friedensbrücke over the Sill in Innsbruck (Austria)

(05/03/2013) For the construction of the new Friedensbrücke over the Sill in Innsbruck (Austria) Schöler + Bolte shear connectors dia. 22x150 mm were used.